• NEWS
  • PROJECTS
  • CONTACT
  • Dutch
  • English
Joris Hoogstede Architectuur
  • NEWS
  • PROJECTS
  • CONTACT
  • Dutch
  • English

In the last weeks of 2017, work started on the detached house in Waalre. The foundation has since been poured and the rising masonry below ground level clearly shows the contours and spatial layout of the house. This week, the first floor will be poured and then construction of the interior walls will begin.

  • Variant studies expansion Rosmalen Older Post
  • Start design conversion to low energy house Leende Newer Post

© Copyright 2014-2026  |  Joris Hoogstede Architectuur